Available minutes divided by customer demand.
| Min / unit | – |
Use this calculator to get lean takt time: the pace at which you must finish a unit to match demand. Enter net available minutes and units wanted in that window.
Takt = available minutes / demand. 480 minutes and 240 units is 2 minutes per unit. Cycle time should sit under this. Breaks should already be removed from available minutes.
Available min: Net working minutes.
Demand: Units the customer wants in that window.
Min / unit: Takt time in minutes per unit.
Related calculators