698 tools
All

Takt Time Calculator

Available minutes divided by customer demand.

 

 

Min / unit

About this calculator

Use this calculator to get lean takt time: the pace at which you must finish a unit to match demand. Enter net available minutes and units wanted in that window.

Takt = available minutes / demand. 480 minutes and 240 units is 2 minutes per unit. Cycle time should sit under this. Breaks should already be removed from available minutes.

Available min: Net working minutes.

Demand: Units the customer wants in that window.

Min / unit: Takt time in minutes per unit.